Metal Processing Plant

Case Study #1:

Metal Processing Plant

Branch in charge: Germany

Destination: Qingdao, China

Cargo: Metal Processing Plant

Volume: 5,200 frt

Job description:

The Project was executed by container vessels from Hamburg, Germany, to Qingdao, China.

The main cargo – OOG (out of gauge) and standard equipment – was shipped by flats. Some heavy and over long cases were shipped as break bulk by a container vessel.

Pickling Line

Case Study #2:

Pickling Line

Branch in charge: Germany

Destination: Xingang, China

Cargo: Cold Rolling Annealing Pickling Line

Volume: 3,600 frt

Job description:

Shipment was executed by container vessels from Hamburg, Germany, to Xingang, China.

Most of the cargo – special equipment OOG (out of gauge) and standard equipment – was shipped as FCL.

All heavy and/or over long cases were shipped as break bulk by a container vessel.