Visayas Mindanao± 350kv DC interconnection EPC project, Philippines

Case Study #1:

Visayas Mindanao± 350kv DC interconnection EPC project, Philippines

Branch in charge: China

Destination: Cebu, Philippine/Mindanao, Philippine

Cargo: Transformers and accessories
including 7 units Siemens transformers each 8.90x3.70x4.70(m) / 110.5tons & 4 Siemens transformers each 10.00x3.80x4.00(m) / 91.0 tons

Volume: 4023 frt

Job description:

Hansa Meyer Global Transport Shanghai was awarded to deliver all the shipments from China / Germany Siemens factory to the jobsite in Cebu Island / Mindanao Island in Philippine  for 11 units transformers and accessories with DDU item up to site including manually setting on foundation.

Total Project duration only 8 months, moreover we faced the outbreaking of COVID-19 both in Germany and Philippine , and lots of limits by local government for measures of control COVID-19, we and project owner worked together and finally completed the delivery of all the transformers and accessories successfully.

The total project has a volume of approx.. 4023 FRT and includes heavy lifts 7@ 110.5 tons+4@ 91 tons

Turbine Generator

Case Study #2:

Turbine Generator

Branch in charge: Philippines

Destination: Petron Limay Bataan, Philippines

Cargo: Turbine Generator

Volume: 49,900.05 frt

Job description:

Direct shipment of a 72 t turbine generator from M.V. Wakasa by means of a multi-axle trailer.

Coal Fired Power Plant

Case Study #3:

Coal Fired Power Plant

Branch in charge: Philippines

Destination: Toledo, Cebu

Cargo: Coal Fired Power Plant, 82 MW

Volume: 38,385 frt

Job description:

Shipside receipt and transportation of a 170 t turbine generator and its accessories to Toledo Power Corp., total volume – 1,045 m3.

Ball Mill

Case Study #4:

Ball Mill

Branch in charge: Philippines

Destination: Masbate, Philippines

Cargo: Mill shell, Head and Accessories

Volume: 911 frt

Job description:

  • Pick up from the place of origin (Melbourne and New Castle, Australia)
  • Unloading/ receiving / customs clearance at Batangas port, Batangas City
  • Roll on barge in Batangas port
  • Delivery to PGPRC private port in Masbate
  • Inland transportation to the mine site.

Telecom Equipment

Case Study #5:

Telecom Equipment

Branch in charge: Philippines

Destination: Visayas and Mindanao sites, Philippines

Cargo: Telecom equipment

Volume: 280 frt

Job description:

  • Customs clearance and delivery to HMGT’s warehouse
  • Warehousing and inventory
  • Delivery to various sites in Visayas and Mindanao, Philippines
  • Manual hauling of the equipment from the staging area up to the site

(Note: 80% of the sites are not passable by any type of vehicles, thus, manual hauling is required).

Substation Equipment

Case Study #6:

Substation Equipment

Branch in charge: Philippines

Destination: Binga / Itogon / Beguet, Philippines

Cargo: Transformers, Accessories and other Substation Equipment

Volume: 293.2 frt

Job description:

  • FOB Shanghai, China to DDU Binga, Itogon, Benguet
  • Customs clearance / DOF exemption
  • Inland transport including unloading and spotting of transformer