Unsere Case Studies in Brasilien
Industrial Conveyor belts
Industrial Conveyor belts
Branch in charge: Brazil
Destination: Pecem + Paranagua, Brazil
Cargo: Conveyor Belt
Volume: 4 x 110 tons Airfreight Charter AN 124 / 40 x 45 tons Ocean freight
Job description:
Transportation of conveyor belts from USA (airfreight) and Australia (Ro/Ro Ocean freight) to Brazil.




Ship Loader
Ship Loader
Branch in charge: Germany
Destination: Tubarao, Brazil
Cargo: Ship loader
Volume: 15,000 frt
Job description:
Transportation of ship loaders from Guangzhou, China to Tubarao, Brazil.
The two shipments were based on the preliminary detailed technical preparations and material supply by air and ocean from Europe and Brazil to China.
The main units measured 49.50 x 16.90 x 21.20 m with 1,880 t unit weight, were loaded by the vessel cranes after dismantling of the counterweights.
For the midstream loading operations at about 40 km down the Pearl River towards Hong Kong some 800 t shackles and tailor-made grummets were used.
Discharging at Tubarao was also arranged by means of the vessel cranes.






Equipment for MDF Plant
Equipment for MDF Plant
Branch in charge: Germany
Destination: Itajaí, Brazil
Cargo: Equipment for an MDF Plant
Volume: 4,500 frt
Job description:
The project consisted of several shipments: the cargo from Germany was shipped as a part charter, some container lots were shipped from Italy and and the other container lots – from Shanghai, China. The entire shipment was arranged to CFR Itajaí, Brazil.
A bin belt was the largest piece:13.550 x 4.430 x 4.760 mm, 34 t.






Metal Processing Plant
Metal Processing Plant
Branch in charge: Germany
Destination: Joana Leite, Brazil
Cargo: Metal Processing Plant
Volume: 2,942 frt
Job description:
This project cargo was shipped in 6 lots. The smaller pieces stowed into container and the out-of-gauge pieces loaded onto flat racks.
The out-of-gauge cargo was discharged at port of destination Santos and the whole cargo was delivered on the basis of DAP Joana Leite by using standard trucks and mega trailers.
The largest piece was approx. 1225 x 180 x 211 cm 9.5 t.