Press Parts

Case Study #1:

Press Parts

Branch in charge: HMGT Mexico and Brazil

Destination: Mexico Ramos Arizpe

Cargo: Press Parts / Break Bulk 49 pieces of Break Bulk, 685 m/ton

Volume: 1,143.23 frt

Job description:

We were nominated to fix this job together with HMGT Brazil. We coordinated the transport from FOB Santos to DAP Ramos Arizpe. We received the Heavy Lifts directly from the vessel onto waiting truck and we arranged the deliveries as per sceduled program.

Steam boiler parts

Case Study #2:

Steam boiler parts

Branch in charge: HMGT Mexico

Destination: Spain

Cargo: 98 pieces of Break Bulk, 433 m / to

Volume: 635,42 ft

Job description:

We were nominated to fix this job together with our partner from Bilbao, Spain. It was the first job where we moved pipes within Mexico. We did the transport with client satisfaction. The Pipes had a length of 22,35 m.

Our customer is a very active company in the power generation industry. They create many jobs in Mexico.

Press to Mexico

Case Study #3:

Press to Mexico

Branch in charge: Mexico

Destination: Mexico Puebla via Veracruz

Cargo: 5 out of gauge and heavy lifts

Volume: 291 frt

Job description:

We were nominated to fix this job together with our partner from Bilbao, Spain. We coordinated all activities FOB Bilbao up to DAP Puebla via Veracruz.

All Heavy Lifts were received directly from the vessel onto waiting truck.

Our client is a very active automobile parts producer in the industry.

2 Presses for Automotive Manufacturers

Case Study #4:

2 Presses for Automotive Manufacturers

Branch in charge: Mexico

Destination: Mexico Puebla via Veracruz

Cargo: 2 Presses for Automotive Manufacturers, 14 out of gauge and heavy lifts

Volume: 825 frt

Job description:

We were nominated to fix this job together with our partner from Bilbao, Spain. We coordinated all activities FOB Bilbao up to DAP Puebla via Veracruz.

All Heavy Lifts were received directly from the vessel onto a waiting truck.

Cement Plant

Case Study #5:

Cement Plant

Branch in charge: Germany

Destination: Palmar de Bravo, Puebla, Mexico

Cargo: Cement Plant

Volume: 10.250 frt

Job description:

Planning, steering, supervising and shipping of the
containerized and break bulk cargo, including the
over-dimensional and heavy lift cargo from FCA
several locations in Germany and Europe up to DAP
job site in Palmar de Bravo, Puebla.

The heaviest / largest pieces:
4 roller units, 1113 x 408 x 381 cm, 175 t each.

Cement Plant

Case Study #6:

Cement Plant

Branch in charge: Germany and Mexico

Destination: Rijo Bijao, Honduras

Cargo: Cement Plant

Volume: 7,200 frt

Job description:

A total of 7,200 frt was delivered in four charter shipments with heavy lifts of up to 95 t (13 units in total).

The main lot was shipped from Antwerp to Puerto Cortes, the main port of Honduras, 32 km away from Rio Bijao.

Furthermore, containers and breakbulk parts were transported from Mexico, Spain, China and India. The cargo was also trucked from Mexico to Honduras.

Cement Plant

Case Study #7:

Cement Plant

Branch in charge: Germany

Destination: Santiago de Anaya/ Hidalgo/ near Actopan, Mexico

Cargo: Cement Plant

Volume: 25,000 frt

Job description:

48 breakbulk shipments.
136 FCL shipments.
20 airfreight shipments.
457 domestic shipments.

The largest item was shipped by sea:
1 x mill cylinder: 15 x 5.30 x 5.45 m, 98 t.

BLANKS TRANSFER PRESS 3000 METRIC TONS

Case Study #8:

BLANKS TRANSFER PRESS 3000 METRIC TONS

Branch in charge: Germany

Destination: Hermosillo Son, Mx.

Cargo: The slide had the following measurements

Job description:

Our scope during the project was the following:

•The release process with the shipping line.
•The Cargo Handling at Altamira port.
•The Inland freight from Altamira to Hermosillo Son.
We coordinated the direct discharge of the slide
on to awaiting truck at port terminal of Altamira.

We supervised the direct discharge and proper lashing and securing
The transport lasted one week and was performed in June 2021.

7 x 4.10 x 3.6 mts with 109 Tons.

Case Study #9: