Press machines to Dingolfing
Case Study #1:
Press machines to Dingolfing
Branch in charge: Brazil
Destination: Dingolfing, Germany
Cargo: Press Machines
Volume: 1.552 cbm / 1.206 t incl. heavy lifts up to 173 t unitweight
Job description:
We transported two press machines from Santos port, Brasil via Antwerp, up to Dingolfing, Germany.
Steel Structures
Case Study #2:
Steel Structures
Branch in charge: Duesseldorf
Destination: Luenen, Germany
Cargo: Steel structures for a power plant
Volume: 15,000 frt
Job description:
We were awarded with a contract on transportation of the painted steel structures for a coal bunker and power house from EXW Shanghai, China, to DDU Luenen, Germany.
Units measured up to 28 m long and 4.50 m wide, of 60 t unit weight.