Unsere Case Studies in Thailand
2 Vessels to Thailand
2 Vessels to Thailand
Branch in charge: Thailand
Destination: Laem Chabang, Thailand
Cargo: 2 Vessels
Volume: 16,219 m x 4,486 m / 57 tons per Unit
Job description:
Hansa Meyer Global has been nominated to arrange the transportation of two large vessels from the client´s factory in Thailand to an Oil Refinery in Laem Chabang.
Due to the dimensions a careful planning and transport during night time was required. The project team of Hansa Meyer Global had to participate in meetings with the Oil Refinery in order to comply with all the safety requirements for transportation inside the plant.
Combined Cycle Power Plant
Combined Cycle Power Plant
Branch in charge: Germany / Thailand
Destination: Chana, Songkhla, Thailand
Cargo: Combined Cycle Power Plant
Volume: approx. 17,000.00 frt, incl. 3 generators and 3 turbines with weights up to 318 t
Job description:
We arranged shipments from Europe, USA, Indonesia, Japan and Korea, with delivery to the site, DDU Chana, located in Songkhla Province about 1,300 km south of Bangkok. The scope of work also included civil works, assembly of condensers and installation of the condensers and gas turbine generators onto the foundations.
All heavy cargoes were unloaded by a heavy-lift vessel onto the barges at the Songkhla port and transshipped to a private jetty in the Songkhla Lake for roll-off and delivery to the site after intermediate storage.
Crystallizer
Crystallizer
Branch in charge: Germany
Destination: IRPC Port, Thailand
Cargo: Crystallizer
Volume: 1480 x 640 x 640 cm, 75 t
Job description:
Transport:
from Kaohsiung main port FOB, Taiwan
to IRPC port (private pier) CFR, Thailand
Loading / unloading:
By means of the vessel crane and spreader
Peculiarities:
- stepped center of gravity
- under deck stowage only
- direct loading from/ onto the truck
- narrow time frame
Offshore Installation of Wellhead Platforms
Offshore Installation of Wellhead Platforms
Branch in charge: Thailand
Destination: Carigali, Malaysia Thailand Joint Development (MTJA)
Cargo: Jacket - 1 unit of 2,847 t + Topside - 1 unit of 1,324 t
Volume: 5,000–10,000 frt
Job description:
Shipping agency sevices, customs clearance and tug assistance to load out the jacket and top side from CUEL LIMITED Leam Chabang fabrication yard on the flat barge to be shipped to JDA oil field, located in the Joint Development Area (JDA).
Offshore Installation of Wellhead Platforms
Offshore Installation of Wellhead Platforms
Branch in charge: Thailand
Destination: Carigali, Malaysia Thailand Joint Development (MTJA)
Cargo: Jacket - 1 unit + Topside - 1 unit of 1,956.86 t
Volume: 5,000–10,000 frt
Job description:
Shipping agency services, customs clearance and tug assistance to load out the jacket and top side from Thai Nippon Steel fabrication yard at Bangpakong on the flat barge to be shipped to JDA oil field, located in the Joint Development Area (JDA).