Case Studies in Qatar
Qatar Aluminium Smelter
Qatar Aluminium Smelter
Branch in charge: Germany
Destination: Qatar
Cargo: Crane Parts for the Aluminium Smelter
Volume: 7,000 frt
Job description:
Transportation of 13 pot tendering machines and 3 anode jacking frames from Villefranche, France, 3 transfer gantries from Abu Dhabi and 18 lifting beams from Dubai to DDU Mesaieed, Qatar.
Shipments were done by breakbulk and ro/ro vessel to Doha, Qatar.
Air Cargo Handling Equipment
Air Cargo Handling Equipment
Branch in charge: Germany
Destination: Qatar
Cargo: Air Cargo Handling Equipment
Volume: 9,000 frt
Job description:
HMGT was awarded with the transportation of Air Cargo Handling Equipment (Rollerdecks, Turntables, Elevating Transfer Vehicles) up to DDU Doha Airport, Qatar.
The transport has been executed in 45 partial shipments by using container and ro/ro carriers. Units had a maximum width of 4.7 m.